|
|
Learning Plan 5 Troubleshooting at the physical layer.
Network Troubleshooting/Integration (150-116)
|
Thomas Olivotti |
Objectives:1. To trouble shoot a physical layer network problem.
2. Make a powerpoint presentation on PSNEXT, ELFEXT, Impedance and ACR.
|
|
|
Cable Testing
In this exercise I had to create a network problem with a cable. My specific problem I had to create was to take a Cat5e cable and create NEXT (Near End Cross Talk) by punching it down incorrectly in the patch panel.
|
Click on Image
|
|
Link to PowerPoint
LP5 PowerPoint
|
Presentation of Cable Tests
In this exercise I had to give a presentation on PSNEXT, ELFEXT, Impedance and ACR. There is a link to my powerpoint on the left.
|
|
|
|
© Copyright 2009. All rights reserved. |
|
|
|